Unger-Water Power Solutions has partnered with the Keowee Sailing Club in Seneca, South Carolina to repair damages done by a rogue wind storm back in June. The new gangways will be in place by early October. When they are in place the UW team will mobilize to reenergize Docks 1 and 3.
Unger-Water Power Solutions will also be doing an assessment on any other possible damage that is unseen from dock level. An in-depth (pardon the pun) look under the remaining docks via boat and lights for damaged conduits and wiring will let us determine if any further work has to be done.
The team at Keowee Sailing Club has been very helpful in collaborating with us to begin this very important project to get them back to sailing safely into the sunset!